Lista e referencave për punimet e ndërtimit

Project

Primary Line 20 kV, Secondary Line 0.4 kV, distribution lines

Year

2000

Project

Circuit lighting from Street Siri Kodra till to Street Karl Topia

Year

2000

Project

20 kV Medium Voltage line, Network cable 20 kV, Power Transformer Cabin 20 kV, energy measure.

Year

2000

Project

Power Transformer Cabin 10 kV, distribution network low voltage cable

Year

2000

Project

Complete reconstruction works for elementary School “Konferenca e Pezes”

Year

2000

Project

Water Supply Shkodra Sity, Delivery and Installation of two power transformers 800 kVA

Year

2000

Project

Delivery and installation of 9 pieces “Diving Electro pumps”

Year

2000

Project

Delivery and installation of 280 pieces “Cast Iron well cover”

Year

2000

Project

Delivery and installation of 5 pieces “Centrifugal Electro pumps”

Year

2000

Project

Delivery and installation of power transformer 315 kVA

Year

2000

Project

Delivery and installation of 2 pieces “Centrifugal Electro pumps”

Year

2000

Project

Delivery and installation of 1 pieces “Centrifugal Electro pumps”

Year

2000

Project

Delivery and installation of 2 pieces “Underground Electro pumps”

Year

2000

Project

Delivery and installation of power transformer and control pannel of the pupms

Year

2001

Project

New 10 kV Medium voltage line 4,5 km, Zallher – Boville

Year

2001

Project

New 10 kV Medium voltage line 5,3 km, Village Zgurre – Mal Gjepal

Year

2001

Project

Delivery and installation of 8 pices pumps different power from 11 kW till 75 kW

Year

2001

Project

Delivery and installation of 2 pieces 75 kW

Year

2001

Project

Delivery and installation of 2 pieces 15 kW

Year

2001

Project

Delivery and installation of 2 pieces 75 kW

Year

2001

Project

Delivery and installation of 1 pieces 120 kW

Viti

2001

Project

Delivery and installation of power transformer 315 kVA

Viti

2001

Project

Delivery and installation of power transformer 400 kVA, 20 kV / 04 kV and distribution network

Year

2001

Project

Delivery and installation of power transformer 400 kVA, 20 kV / 04 kV and distribution network

Year

2001

Project

Delivery and installation of power autotransformer 1250 kVA, 20 kV / 04 kV

Year

2001

Project

Delivery  different size of cable, ground carbon, various electrical material

Year

2001

Project

Delivery and installation of Low Voltage cable 4 x 95 mm2 and 4 x 75 mm2

Year

2001

Projekti

Dorëzimi dhe Instalimi  1 cope “Diving electro pump”

Viti

2001

Project

Delivery and installation of Diving electro pump 1 piece

Year

2001

Project

Delivery with medium voltage wires

Viti

2001

Project

Delivery electric insulation lack for transformer and motors

Year

2001

Project

Purchase electro pump

Year

2002

Project

Delivery and installation of Swhich Gear 20 kV

Year

2002

Project

Technology Equipment Machines

Year

2002

Project

Reconstruction of electrical Medium Voltage  6 kV line in region of Mal Gjepal

Year

2002

Project

Construction of network computers

Year

2002

Project

Purchase wires

Year

2002

Project

Purchase various batteries

Year

2002

Project

Delivery  and installation of power transformer: 1 piece 630 kVA, 10 kV / 0,4 kV 2 pieces 100 kVA, 10 kV / 0,4 kV Delivery of different connection material for Medium Voltage and low voltage line, Delivery of different cable sizes medium voltage and low voltage
Installation of chlorination system

Year

2002-2003

Project

Delivery and installation of Automatic Voltage Regulator Low Voltage 200 kVA

Year

2003

Project

Reconstruction of room of batteries

Year

2004

Project

Construction of cable line and electrical  installation of switch gears for 2 transformers 1250Kva, 20Kv

Year

2004

Project

Construction of over head line 20kV for Airport of Kukes

Year

2005

Project

Delivery and installation of Diving electro pumps

Year

2005

Project

Delivery and installation of surface electro pumps

Year

2005

Project

Delivery and installation of Diving,surface electro pumps

Year

2005

Project

Delivery and installation of switch board for transformer,pumps,overhead line 10kV for  Water Supply  Gjirokaster

Year

2005

Project

Delivery and installation of switch board for transformer,pumps,overhead line 10kV for Water Supply  Gjirokaster

Year

2005

Project

Delivery and installation of transformers

Year

2005

Project

Delivery and installation spare parts for crane

Year

2005

Project

Delivery and installation of Diving, electro pumps

Year

2005

Project

Delivery and installation of Diving,surface electro pumps and electrical installation Water Supply  Fushe-Kruja

Year

2006

Project

Delivery and installation of Diving,surface electro pumps and electrical installation Water Supply  Peshkopi

Year

2006

Project

Delivery and installation of Diving,surface electro pumps and electrical installation Water Supply  Pogradec

Year

2006

Project

Supply with electrical energy of Water Supply Pogradec

Year

2006

Project

Overhead line 20kV for water supply Pogradec

Year

2007

Project

Supply with electrical energy  Kukes Camp

Year

2007

Project

Overhead line 20kV for water supply Pogradec

Year

2007